Rental scissor-lift fleet keeps batteries on cycle.
Placeholder summary. A short paragraph describing the customer, the operational pain point, the charger model selected, and the measurable result over a deployment window.
Read case study
How operators, OEMs and rental fleets put ALT and LIT chargers to work. Real applications, real environments, real results.
Placeholder summary. A short paragraph describing the customer, the operational pain point, the charger model selected, and the measurable result over a deployment window.
Read case study
Floor Care
Joynice replaced multiple competitor chargers with the ALT-400 and ALT-700. TREKon data settled customer disputes and STP Tech reduced SKUs across the IPC scrubber fleet.
Read case study
Industrial EV
Placeholder summary. Describe the autonomy duty cycle, why the higher-output charger was specified, and any environmental constraints handled by IP67 sealing.
Read case study
Placeholder summary. Lay out why the customer prioritised standard-duty over connected diagnostics, charge times across a 60-cart fleet, and field-replaceability outcomes.
Read case study
MEWP
Placeholder summary. Highlight the OEM relationship, the integration timeline, TREKon enabling field troubleshooting, and the warranty-cost reduction.
Read case study
Placeholder summary. Cover temperature-compensated charging, the move from generic OEM packs, and the documented uptime improvement after the switch.
Read case studyNo case studies match this filter yet. More coming soon.